TxDOT UPDATE

 

 

LUFKIN – As warmer temperatures and sunny days take over, TxDOT crews are out in all nine counties of the Lufkin District continuing and completing construction and maintenance projects.
 
As motorists travel through active work zones, they are urged to slow down and stay alert. Move into another lane if there is one available. If no other lane is available, reduce speed by 20 miles per hour below the posted speed limit. Remember that traffic fines double when workers are present.
 
Work for the coming week in the Lufkin District includes:
 
ANGELINA
 
US 69: Crews continue to clear the right of way and burn brush, so smoke should be expected in the area from FM 844 to FM 1270.
 
US 69: Work continues to excavate ditches and cement treat flexible base from the Huntington city limits to FM 844. Daily lane closures are expected on this project that will widen the roadway from two lanes to a divided four lane roadway with a continuous two-way left turn lane..
 
US 59/SL 287 East: Crews are scheduled to continue water blasting concrete surfaces to remove residual asphalt on the southbound direct connector from 8 pm to 6 am. The southbound connector will be closed each night during work hours.
 
BU 59/Chestnut Drive: Crews are continuing to install concrete barrier at the intersection that requires a single lane closure on Timberland Drive. This work is part of a construction project to improve guardrail to design standards at various locations.
 
FM 1194: Striping is scheduled to be placed and pavement edges are being backfilled in this project that has provided additional paved surface width from SL 287 to FM 3150.
 
FM 842: Crews are scheduled to repair road base in various locations.
 
FM 706: Base repairs are scheduled in various locations.
 
NACOGDOCHES
 
US 59: Crews will be working on northbound shoulders near the weigh station south of Nacogdoches.
 
SH 103 East: Crews continue to upgrade metal beam guard fence to design standards from the Angelina County line to the San Augustine County line.
 
SH 7: Crews continue to upgrade metal beam guard fence to design standards from the Angelina County line to BU 59.
 
SH 21: The right of way is being prepared on this project that will improve guardrail to design standards and safety treat fixed objects from SH 7 to the San Augustine County line.
 
FM 343: This project is being monitored for vegetative establishment from the Cherokee County line to FM 225 after the pavement was reconstructed and widened.
 
FM 1087: Driveway culverts and crossroad structures are complete in this project to upgrade and safety treat fixed objects from US 259 to FM 95.
 
FM 1878: The final surface is scheduled to be placed and sod is being installed on this project that has replaced the bridge and approaches at LaNana Creek.
 
SHELBY
 
SH 87: Barricades have been set and work has begun to install driveway pipe on this project to improve and upgrade guardrail to design standards and safety treat fixed objects from SH 7 to SH 147.
 
CR 4620: Right of way work has begun and a detour bridge is being placed at Risinger Creek.
 
SAN AUGUSTINE
 
US 96: This area is being monitored for vegetative establishment after the pavement was reconstructed with additional passing lanes from the Shelby County line to FM 3451.
 
SH 21: Embankment is being hauled and the bridge deck has been placed on the bridge and approach replacement at Niciper Creek.
 
FM 711: Right of way work is underway with daily lane closures from the Shelby County line to US 96 as they work to reconstruct and widen the pavement.
 
SABINE
 
SH 87: Crews are scheduled to repair road base in various locations.
 
TRINITY
 
US 287: Work is scheduled for an asphalt overlay from FM 1280 to the Houston County line.
 
FM 357: Crews will continue to upgrade guardrail to design standards from Apple Springs to FM 2262.
 
Various locations: Crews will be patching potholes and repairing signs.
 
 