News Headlines

TxDOT Local Area Update

 

 

NACOGDOCHES COUNTY

US 59: Crews are preparing the right-of-way and working on drainage structures on this highway improvement project that will construct additional main lanes, overpasses and access roads from SH 7 to 1.2 miles south of Spradley Street.

 

US 59: Crews are scheduled to repair an overhead flashing light in Appleby. Lane closures expected.

 

SH 21: Crews are monitoring vegetative establishment after placing culvert extensions designed to upgrade metal beam guardrail to design standards and safety treat fixed objects from SH 7 to the San Augustine County line and on SH 21 from the San Augustine line to FM 3448 in Sabine County.

 

FM 226: Crews are monitoring vegetative establishment on this project designed to upgrade metal beam guardrail to design standards and safety treat fixed objects from SH 21 to the end of pavement.

 

FM 2609: Work is scheduled on traffic signals and curbs and gutters on this project designed to widen the roadway from Raguet Street to North Street (BU 59). This roadway remains closed to through traffic.

 

FM 2609: Crews are applying flex base, preparing right-of-way and extending structures on this project designed to reconstruct and widen the pavement from FM 941 to the end of pavement. Daily lane closures are scheduled.

 

FM 1275: Crews are scheduled to repair edges from SL 224 to the end of pavement in various locations. Lane closures are expected.

 

SL 224: Work is scheduled to place striping from FM 2259 to US 59 and from US 59 to FM 2609 on this project designed to place an asphalt overlay. Daily lane closures are scheduled.

 

 

SAN AUGUSTINE COUNTY

SH 21: Crews will continue to place panels on this bridge replacement project at the Attoyac River. Lane closures expected.

 

FM 711: Crews are monitoring vegetative establishment on this project designed to reconstruct and widen the pavement from the Shelby County line to US 96.

 

FM 1277: Crews are scheduled to repair base in various locations.

 

FM 95: Crews will complete slope and edge repair in various locations.

County Road 205: Crews are scheduled to place the bridge deck at Black Creek on this bridge replacement project.

 

SHELBY COUNTY

US 96: Crews are monitoring vegetative establishment from US 84 to SH 87 where crews have planed, leveled the roadway and placed a permeable friction course.

 

FM 1645: Crews are preparing the right-of-way on this project designed to reconstruct and widen the roadway from US 59 to SH 87. Daily lane closures are expected.

 

SABINE COUNTY

FM 705: Crews are scheduled to repair base in various locations.

 

FM 1: Crews are monitoring vegetative establishment from the San Augustine County line to SH 103 after widening the pavement and upgrading metal beam guardrail to design standards.

 

Roughriders Sports

Family Features

Loading Family Features Content Widget
Loading Family Features Article